JM Automated Solutions

Diagnostic

We start on one system. Then we ship it.

A diagnostic is a live dry run on one station, two to four weeks, on your line or with your parts and device list. We map I/O, stand the HMI up, and keep outputs inhibited until you release automatic mode. Production stays running. After you sign the dry run, we specify, buy, panel, and commission like any other system we ship.

How it runs

Kickoff, dry run, then site acceptance.

Kickoff

I/O, samples, and the costly move

What is being scored, what must reject or hold, and who sits at the HMI. We walk the station, or you send parts and a device list. That walk-down becomes the scope you can buy against.

Dry run

Live on the station, outputs inhibited

MILO Inspector runs on the HMI against the real camera, checkweigher, or PLC tags. Operators see recommended rejects while outputs stay inhibited. You see how this crew dispositions borderline parts before automatic mode is released.

Release

Site acceptance

Automatic outputs are enabled after you sign the dry run. Site acceptance, operator sign-off, punch list closed. The system is then yours, with support after site acceptance.

What we buy and stand up

Cameras, panel, mechanical work, program, commission.

Long-lead hardware is ordered against a purchase order and a deposit. You accept the system at site acceptance on your floor. A second system at the same plant, with less engineering time, is the test that the first one was built to be repeated.

What a system includes

Start

Tell us about the system.

Tell us the application and the industry. We will say whether a diagnostic on that station is the right first engagement.

Tell us about the system