The system

Designed, programmed, installed, commissioned.

JM designs, builds, and installs the station, which is the cameras, frame, lighting, reject, safety wiring, and site acceptance. Your operators keep the costly calls. One integrator from specification through site acceptance, including FDA-regulated food, drug, and device rooms.

The commissioned station is described on the homepage.

What you get

How the system works for your line.

Stainless inspection system with cameras, lighting, and cans on the conveyor

Hardware on your floor

Cameras, lighting, frame, control panel, PLC, HMI, and the reject or hold path. We specify, buy, build, install, and commission them as one system.

Beverage packaging line with case conveyors

Software on the HMI

Operators see pass, reject, or hold, and the reason, at the HMI. Clear calls can run in automatic. Borderline or high-cost dispositions wait for confirmation. Quality gets an audit trail before the reject fires, ready for 21 CFR Part 11 work when the room requires it.

Open industrial control panel with PLC, HMI, and field wiring

The panel we build

PLC, HMI, and field wiring in one cabinet. We specify it, build it, and commission it with the rest of the station.

Robot system with fencing and conveyor, operators nearby

Your crew keeps operator confirmation

Someone on your floor confirms at the HMI. Every override is in the shift log: who confirmed, what moved, and when. That is the record quality asks for after a hold or a fail.

Stainless process equipment and motors in a hygienic plant
Food and beverage systems run in washdown. The station is built for that room.

On the floor

We specify their camera into our system.

When a hardware sales desk has a plant that needs a working station, that introduction is welcome. They keep the camera or robot PO. We specify the remaining hardware, build the panel, and commission the system so the sale is a station that runs, not a camera on a table.

Tell us about the system

What ships with the system

Drawings, site acceptance, training, spare parts.

Package

Before it leaves

I/O list, electrical drawings, and HMI screens. You accept the system on our floor or yours before it ships. The package is written so your quality team can take it into FSMA, 21 CFR Part 11, or QMSR validation on that station.

On your floor

Site acceptance and after

Site acceptance with your operators at the HMI. Recommended spare parts list. After sign-off, a yearly care agreement covers remote support, a spare light and camera, and an operator refresh, along with recipe changes and log export.

A second purchase order at the same plant or a sister plant, with fewer engineering hours, is the test that the first system was built to be repeated.

First system